B69-X48 lead the Daylight Overland through Ballarat North Thurs 13/01/1983. |
The Daylight Overland is probably the train that best places the location and era of the layout. From Monday 20th December 1982 until Tuesday 1st February 1983, a daylight Overland operated in each direction between Melbourne and Adelaide. This was a trial to determine if a market existed to justify the operation of a regular Daylight service.
The westbound service ran combined as far as Horsham with the regular 0755 Horsham pass. The loco for the Horsham train was marshalled ahead of the locomotive for the Overland. The N set and VLPY or VBPY van were placed at the rear of the Overland cars and were detached on arrival in Horsham.
B72-X39 lead the combined Daylight Overland and Horsham pass. on Fri 21/01/1983. |
The eastbound service ran as a separate service throughout. The X or S were exchanged for a 930 at Serviceton. The services were timetabled to cross at Diapur. The services operated Monday to Saturday, although due to public holidays, services operated on Sundays for Boxing Day and New Years Day.
S312 leads the Up Daylight Overland across Macarthur Street at Ballarat North on Sat 15/01/1983 |
X48 leads the Daylight Overland past Ballarat C Box on 23/12/1982 |
To provide the two carriage sets, all spare Overland carriages and three Australian National AD class sitting carriages were used. The AD cars were temporarily spare due to the conversion of the Adelaide - Port Pirie line from broad to standard gauge. The consist of the two sets were:
- CD-BJ-BJ-RBJ-AJ-PCO
- PCO-Club-AD-AD-AD-SCD
Date
|
Locos
|
Comments
|
Mon 20/12/1982
|
X-B Down, S313
Up
|
|
Tues 21/12/1982
|
B78-S304 Down,
X49 Up
|
|
Wed 22/12/1982
|
B68-X48 Down
|
|
Thurs 23/12/1982
|
B69-S303 Down,
X48 Up
|
|
Fri 24/12/1982
|
B78-X49 Down
|
|
Sun 26/12/1982
|
X48 Down
|
|
Mon 27/12/1982
|
B65-X49 Down,
X48 Up
|
|
Wed 29/12/1982
|
B74-X49 Down X48
Up
|
|
Fri 31/12/1982
|
B68-X49 Down
|
|
Sun 2/01/1983
|
X48 Down
B60-B75 Down
|
operated as two separate
trains
|
Mon 3/01/1983
|
B82-X49 Down
|
No VLPY
|
Tues 4/01/1983
|
B84-X48 Down
|
|
Wed 5/01/1983
|
B68-X49 Down
|
|
Thurs 6/01/1983
|
B66-X48 Down
|
VLPY between
Horsham and Adelaide trains
|
Fri 7/01/1983
|
B66-X49 Down
|
|
Sat 8/01/1983
|
B83-X48 Down
|
|
Mon 10/01/1983
|
B84-X49 Down
|
|
Tues 11/01/1983
|
B64-X48 Down
|
|
Wed 12/01/1983
|
B63-S310 Down
|
|
Thurs 13/01/1983
|
B69-X48 Down
|
|
Fri 14/01/1983
|
X42-S312 Down
|
X42 No.2 leading
|
Sat 15/01/1983
|
B63-X50 Down
|
|
Mon 17/01/1983
|
X43-X48 Down
|
|
Tues 18/01/1983
|
B67-S315 Down
|
|
Wed 19/01/1983
|
B66-S309 Down
|
|
Fri 21/01/1983
|
B72-X39 Down
|
|
Sat 22/01/1983
|
B80-X48 Down
|
|
Mon 24/01/1983
|
B79-X50 Down
|
|
Tues 25/01/1983
|
B62-S313 Down
|
|
Wed 26/01/1983
|
B75-X53 Down
|
|
Thurs 27/01/1983
|
X36-S315 Down
|
|
Fri 28/01/1983
|
B61-X50 Down
|
|
Sat 29/01/1983
|
B68-X53 Down
|
|
Mon 31/01/1983
|
B70-X31-X50 Down
|
B70-X31 ran up
Horsham with 2 N sets
|
Tues 1/02/1983
|
B84-X49 Down
|
The Daylight Overland is formed by modified Lima Indian Pacific cars. Modifications include filing all the corrugations off the roof, filling in the ridges above the windows and adding a new section of fluting. The ends have also been filed flat with new ducting, piping and vestibule connections added.
Each car has had the fluting removed from the lower parts of the side and new underframe added (either BGB or scratch built). I use the one set of carriages to form both the Down and Up services.
2 BJ, a modified Indian Pacific sitting car. |
1 RBJ, additional modifications include filling in of half the windows and filing flat. Gas bottles have been added to the underframe. |
6 BJ |
Underframe modifications |
2CD, a BGB kit riding on Powerline bogies. |
I only have 2 photo's in my collection of the Daylight Overland in operation. These were taken at Sunshine and show X49 on a Up service on Boxing Day 1982. The consist is 2CD-2AJ-1RBJ-4BJ-6BJ-2PCO.
Comments
Post a Comment